TSX: OCG ... | OTCQX: OCGSF ... | FSE: MRG ... | Silver Spot: ...
Home Corporate Santa Ana Project Investors ESG News Presentation

High-Grade Primary Silver

in Colombia

Grade Within Reach

Latest News

Mineral Resource September 14, 2026

Outcrop Silver Announces Updated Mineral Resource Estimate for the Santa Ana Primary Silver Project

Indicated resources contain 29.9 Moz AgEq at 519 g/t AgEq and Inferred resources contain 27.9 Moz AgEq at 369 g/t AgEq, confirming high grades across 13 vein systems.

READ MORE
Exploration August 5, 2026

Outcrop Silver Reports High-Grade Drill Results from Aguilar and Morena Targets

Assay results from exploration drilling at Aguilar and Morena targets continue to expand high-grade silver mineralized shoots within the flagship Santa Ana project.

READ MORE
Exploration June 3, 2026

Outcrop Expands Aguilar Vein System with New High-Grade Silver Intercepts

Drilling results show continued expansion of high-grade mineralization along the Aguilar vein system, reinforcing growth potential in our flagship asset.

READ MORE
Santa Ana Project

Mineral Resource Estimate

September 2026 Updated NI 43-101 Estimate (APEX Geoscience Ltd.) - see news release dated September 14, 2026

Indicated Category

1.79 Mt
Tonnes
518.7 g/t
AgEq (376.4 g/t Ag & 1.80 g/t Au)
29.9 Moz
AgEq

Inferred Category

2.35 Mt
Tonnes
368.5 g/t
AgEq (266.4 g/t Ag & 1.29 g/t Au)
27.9 Moz
AgEq
Resource Category Tonnes (Mt) AgEq Grade (g/t) Silver Grade (g/t Ag) Gold Grade (g/t Au) Contained AgEq (Moz)
Indicated 1.79 518.7 376.4 1.80 29.9
Inferred 2.35 368.5 266.4 1.29 27.9
* Based on a 158 g/t AgEq cut-off grade. Silver-equivalent (AgEq) was calculated using metal prices of US$25/oz Ag, US$1,800/oz Au, 93% Ag recovery, and 96% Au recovery.
Drilled to Date
>130,000 m Drilled to Date
Project Ownership
100% Project Ownership
Vein Field Strike Length
17 KM VEIN FIELD STRIKE LENGTH
Resource Growth
Resource Growth Stage (Expanding)
PEA Pending
PEA pending Studies in Progress

Santa Ana Advantages

Santa Ana is a true primary silver project with strategic advantages that are expected to facilitate faster permitting and development than is possible for most mining projects

TRUE PRIMARY SILVER PROJECT - with 73% of indicated AgEq resources being from silver, this is a true primary silver project with great scarcity value.

HIGH GRADE RESOURCES - allows a smaller mining operation and plant to produce substantial quantities of silver and gold.

VEINS AT SURFACE - mining can be sequenced so that higher grade zones are targeted early in the mine plan. Newly discovered high-grade veins can be incorporated into mine plans relatively easily.

EXCELLENT INFRASTRUCTURE - road access with power, water, labor, and services available should reduce capital and operating costs, as well as accelerate time to production.

SIMPLE METALLURGY - initial testing suggests high silver and gold recoveries using simple gravity and flotation methods, without the need for cyanide, resulting in a high value precious metals concentrate.

STREAMLINED PERMITTING - the small mining footprint resulting from selective underground mining and a small processing plant, along with strong community and local/regional government support is expected to streamline the permitting process for Santa Ana.

COLOMBIA
Outcrop Colombia Projects Map

Silver Markets

Scarcity & Rising Demand

Meet the Team

STRONG MANAGEMENT TEAM & BOARD

The Coreshack

SANTA ANA VEINS CAN DEMONSTRATE EXTREMELY HIGH GRADES OF SILVER AND GOLD

ESG Initiatives

Sustainability / Social Value / Local Strength

PRESENTATION

GET THE LATEST INFORMATION

Santa Ana Project

Historic High-Grade Silver District in Colombia

Ask Outcrop AI